摘要:The rural power networks play a very important role in the power network in China. The rural networks built in the old days are usually not standardized, and therefore, a lot of problems emerged these days. Such as, most of the transmission line is aged, the insulation ability of the transmission line degraded, the household voltage is relatively low, the distribution network line loss is very high, and so on. As the rural power network mainly distributes in the hilly and mountainous land, the altitude of the load points has an important impact to the location of distribution transformer. Meanwhile, because of the existence of the sag, the length of the transmission line is not a straight-line distance. Therefore, this paper modified the traditional optimization model used in the location of distribution transformer, introduced the line correction coefficient (α) which was connected with the sag, improved the line distance computational formula according to the altitude of the load points, and put forward the modified optimization model which is called M-TLOM. Then, an optimized location system of distribution transformer (DTLOS 1.0) based on the Visual Basic 6.0 was developed. The instance analysis indicated that, the modified model could reduce the loss of distribution network.
关键词:rural power network;distribution transformer;location selection;model research;modified optimization model