期刊名称:Journal of Reliability and Statistical Studies
印刷版ISSN:0974-8024
电子版ISSN:2229-5666
出版年度:2010
卷号:3
期号:1
页码:95-103
出版社:Ankur Printing Palace
摘要:This paper deals with the cost benefit analysis of a complex system with correlationin time to preventive maintenance and time taken in preventive maintenance. The systemconsists of two subsystems, say A & B, connected in series. Subs ystem A consists of twoidentical units while subsystem B consist only one unit. The operation of only one unit ofsubs ystem A with subsystem B is sufficient to do the job. The joint distribution of time topreventive maintenance and time taken in preventive maintenance are taken bivariateexponential. Each repaired unit works as good as new. Various measures of system effectivenessof interest to system designers and operation managers are obtained by using regenerative pointtechnique. The graphical behaviors of MTSF and profit function have also been studied
关键词:Mean sojourn time; Reliability; Availability; Busy period; Profit function