摘要:This article reports the results of the flow regime in the catchment area of the Mirna River. The effects of the constructed hydrotechnological objects on the water supply of the river, as well as the Mirna river regime change, are analysed. A change in the flow regime is determined by comparing data gathered before and after the construction of the Botonega dam (1987).
关键词:Mirna catchment area; river bed; river stage discharge; river regime