摘要:The paper takes Jinping II Hydropower Station (8 × 600MW) as an example based on the internal mechanism and operating characteristics of the system, the complete simulation model of the super-long and large water diversion and power generation system has been completed finally.Besides, the method of parameter calibration and correction for the main elements of the system is proposed.By the simulation model, two typical hydraulic transient process test conditions are simulated, here the involved test conditions are as following: double load rejection and primary frequency regulation.At the same time, the calculated results are compared with the test results. The results show that the proposed simulation model can describe the dynamic response characteristic of the super-long and large water diversion and power generation system accurately.
其他摘要:The paper takes Jinping II Hydropower Station (8 × 600MW) as an example based on the internal mechanism and operating characteristics of the system, the complete simulation model of the super-long and large water diversion and power generation system has been completed finally.Besides, the method of parameter calibration and correction for the main elements of the system is proposed.By the simulation model, two typical hydraulic transient process test conditions are simulated, here the involved test conditions are as following: double load rejection and primary frequency regulation.At the same time, the calculated results are compared with the test results. The results show that the proposed simulation model can describe the dynamic response characteristic of the super-long and large water diversion and power generation system accurately.