摘要:Aiming at the problems of poor detection accuracy and low efficiency on the roof and floor interface in horizontal well drilling in coal mine, the design idea of explosion-proof azimuth-while-drilling electromagnetic wave logging instrument in coal mine was put forward. In order to suit the working environment of underground coal seam, the change law of the influence of instrument parameters such as source distance and coil installation angle on the signal response was obtained through forward simulation. Through the simulation research on the response of azimuth-while-drilling electromagnetic wave logging instrument, it provided a basis for selection of parameter optimization design of the instruments applicable to the underground coal mine, and the change law of the response of coal rock roof and floor interface was mastered. The application of this instrument will improve the detection accuracy and efficiency on the roof and floor.