首页    期刊浏览 2024年12月03日 星期二
登录注册

文章基本信息

  • 标题:Reliability assessment of pollution removal of wastewater treatment plant using the method of Weibull
  • 本地全文:下载
  • 作者:Karolina Kurek ; Piotr Bugajski ; Agnieszka Operacz
  • 期刊名称:E3S Web of Conferences
  • 印刷版ISSN:2267-1242
  • 电子版ISSN:2267-1242
  • 出版年度:2020
  • 卷号:171
  • 页码:1-8
  • DOI:10.1051/e3sconf/202017101007
  • 出版社:EDP Sciences
  • 摘要:The aim of study was the analyze of the reliability pollution removal in wastewater treatment plant in Mińsk Mazowiecki. The article presents the results of the reliability of BOD, COD and total suspended solids removal of wastewater treatment plant with actived sludge. Physical and chemical analyses of raw wastewater and treated effluent were carried out in the years 2016–2017 (2 years). The designed size of the treatment plant with actived sludge, expressed in PE is 82 200 residents. During this study period, 50 wastewater samples were collected and analyses. For each of pollution indicators descriptive statistic, percentage reduction and and treatment plant reliability factors (WN) were calculated. The average effectiveness of BOD5 (Biochemical Oxygen Demand), CODCr (Chemical Oxygen Demand) and TSS (Total Suspended Solid) removal in this period of study were respectively: 99.1%, 96.3% and 98.9%. A reliability analysis was performed using the Weibull probability model.
  • 其他摘要:The aim of study was the analyze of the reliability pollution removal in wastewater treatment plant in Mińsk Mazowiecki. The article presents the results of the reliability of BOD, COD and total suspended solids removal of wastewater treatment plant with actived sludge. Physical and chemical analyses of raw wastewater and treated effluent were carried out in the years 2016–2017 (2 years). The designed size of the treatment plant with actived sludge, expressed in PE is 82 200 residents. During this study period, 50 wastewater samples were collected and analyses. For each of pollution indicators descriptive statistic, percentage reduction and and treatment plant reliability factors (WN) were calculated. The average effectiveness of BOD5 (Biochemical Oxygen Demand), CODCr (Chemical Oxygen Demand) and TSS (Total Suspended Solid) removal in this period of study were respectively: 99.1%, 96.3% and 98.9%. A reliability analysis was performed using the Weibull probability model.
国家哲学社会科学文献中心版权所有