首页    期刊浏览 2024年12月02日 星期一
登录注册

文章基本信息

  • 标题:PENGENDALIAN PERSEDIAAN PRIMARY ITEMS DALAM LOGISTIK KONSTRUKSI
  • 本地全文:下载
  • 作者:Lady Lisya ; Lady Lisya ; Rika Ampuh Hadiguna
  • 期刊名称:Jurnal Optimasi Sistem Industri
  • 印刷版ISSN:2088-4842
  • 电子版ISSN:2442-8795
  • 出版年度:2016
  • 卷号:15
  • 期号:1
  • 页码:93-104
  • DOI:10.25077/josi.v15.n1.p93-104.2016
  • 语种:Indonesian
  • 出版社:Universitas Andalas
  • 摘要:Construction logistics are activities that consist of ordering, storage and transportation of materials of construction projects. Storage material is logistics activity that ensure the availability of materials in project site. Generally, material storage activities have been conducted at the project site. Logistics construction is aimed to support the project activities that the completion schedule has been set. Construction logistics issues is determining the schedule of ordering materials so that the project can be implemented on schedule. The purpose of research is to determine the optimum ordering period for the primary items on the main building structure construction and designing inventory control cards as a mechanism for monitoring procurement of materials. This research has been obtained optimal ordering period for the primary items of main building structure with elements of the work using Fixed Period Requirement method. Inventories were already meet the material requirement of each period. Material management has been conducted based grouping approach as many as 31 groups. In addition, this research has proposed the inventory control cards as an instrument for material procurement monitoring. The implications of inventory control cards are coordinate contracting parties with vendors to plan the replenishment of materials to meet the work schedule. Further research can be developed with other aspects such as integrated material order system between contractors and vendors to consider the safety stock. In addition, the information system for planning material is an important consideration for construction projects with large scale so that the companies can plan primary items inventory and other materials in the projects completion more easily, quickly and accurately.
  • 关键词:Construction logistics; inventory; order size; storage
国家哲学社会科学文献中心版权所有