摘要:To construct both high and medium rises building projects, we often encounter delay problems in
implementation. One of the causes is a mismatch of planning methods of implementation with the number of
manpower planning. In addition to the workforce is an important factor in the implementation of construction projects,
the selection of right method for building structures can greatly affect the speed of the project itself.
This paper discusses case studies’productivity of construction methods for building structures analyzed and aims to
determine worker productivity by using certain construction methods. The industrialization of construction method will
be a challenge ahead to face the tight competition globally. This paper will show how the productivity of prefabricated
construction method has less time for completion and higher productivity on worker on site.
The research was conducted in 3 building projects, namely X (1) at Bandung, Y (2) at Bekasi, Z (3) at Depok. Research
is done by observing the level of worker productivity in working on different structural methods in each project.
The first research problem will identify and analyse the factors and variables of worker productivity in structural work
methods for above 3 building projects using qualitative analysis on literature review for structural work methods. The
second research problem will show the results of the analysis of worker productivity in the structural work method for
3 building projects mentioned above.
关键词:Productivity; construction methods; productivity analysis; worker productivity