期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
印刷版ISSN:2347-6710
电子版ISSN:2319-8753
出版年度:2018
卷号:7
期号:5
页码:4481-4490
DOI:10.15680/IJIRSET.2018.0705020
出版社:S&S Publications
摘要:The city of Jakarta is currently a vibrant city to build high-rise buildings in Indonesia, which of course
during the construction process there will be factors that affect the performance of the project, among others, the risk of
project delays, where one example is the delay (non excusable delays). Non Excusable delays are unavoidable or
unforgivable delays due to contractor faults that affect the performance of a particular project at a time. Successful
implementation of a project implemented by a construction service company is associated with the extent to which
project objectives (on time, quality and cost) can be met. By conducting risk management, it is hoped that the right
target of cost, timely, and appropriate project in the construction of tall buildings can be realized.The problem of this
research is to know the factors of non excusable delays that can have risk on project performance specially at project
time, so that by knowing these factors can do preventive steps to improve project performance. The next problem is
identifying the non excusable delays of the construction process.The methodology of this research has a process that
starts from the preparation, implementation and evaluation of research results. The research method used is qualitative
method by using analysis of secondary data result. In this study, secondary data to be obtained, identified by first
preparing the research instrument in the form of research questionnaires.Through this research, it is hoped that it will
produce a recommendation for improvement of risk assessment under study in building project in Jakarta. The impact
of this research will also be useful for contractors to be able to maximize services performed.
关键词:Construction process; risk; non excusable delays; time;