  • 标题:Reengineering Cost Estimation using Scrum Agile Methodology
  • 本地全文:下载
  • 作者:Jaswinder Singh ; Kanwalvir Singh ; Jaiteg Singh
  • 期刊名称:International Journal of Computer Information Systems and Industrial Management Applications
  • 印刷版ISSN:2150-7988
  • 电子版ISSN:2150-7988
  • 出版年度:2019
  • 卷号:11
  • 页码:208-218
  • 出版社:Machine Intelligence Research Labs (MIR Labs)
  • 摘要:Estimating the budget for developing software is one of the prime tasks for software stakeholders. Good estimation increases the customer faith and goodwill for the development company. Many estimation techniques exist for estimating the cost of the software. Estimating reengineering projects are equally important. Researchers estimated cost of Reengineering using conventional algorithmic estimation methods. They also used classical software development approaches to perform reengineering. Conventional estimation methods are suitable in an environment where requirements are predefined and fixed. Practically, these methods can not fit in today’s software development environment. We need more realistic approach to estimate. Since a decade, we have witnessed a change in the Software development approaches. Now software development process is more people centric and realistic for their stakeholders. This change in process is due to Agile. Agile methodology has gained the interest of both customers as well as developers. The main objective of this research is to estimate the cost of reengineering with consensus based estimation technique of Scrum development methodology. Agile Reengineering model is also proposed for estimation and performing reengineering. Thus the research is aimed to provide a model, which not only helps in performing the reengineering estimations but also guides how to perform reengineering. Scrum approach with sprint iteration of three weeks is used to perform reengineering. Chidamber and Kemerer (CK) metric is applied to determine the complexity metrics for various classes of the software. Reengineering is performed to make the project more maintainable by reducing the CK metric complexity. Various tools used in this work include CK java Metric tool (CKJM) ver-1.9 for calculation of CK metrics suit, IBM Rational Rose ver7.5 for Unified Modeling, Rapid Minor studio ver7.1 for determining the reengineering requirements of the software.
  • 关键词:Software Engineering; Software Reengineering; Reengineering Cost estimation; Agile Scrum Methodology