摘要:The article presents a statistical simulation of the deviation of the project duration from the planned value. Regression analysis was carried out - a method of statistical data processing that allows measuring the relationship between one or more causes (factor characteristics) and the consequence (effective characteristic). The end result is a curve and a correlation coefficient, which with a certain probability will allow us to predict the amount of pecuniary injury in this project.
其他摘要:The article presents a statistical simulation of the deviation of the project duration from the planned value. Regression analysis was carried out - a method of statistical data processing that allows measuring the relationship between one or more causes (factor characteristics) and the consequence (effective characteristic). The end result is a curve and a correlation coefficient, which with a certain probability will allow us to predict the amount of pecuniary injury in this project.