  • 标题:Organizational optimization of construction processes by virtue of robotization
  • 本地全文:下载
  • 作者:Elena Makovetskaya ; Antonina Deniskina ; Egor Krylov
  • 期刊名称:E3S Web of Conferences
  • 印刷版ISSN:2267-1242
  • 电子版ISSN:2267-1242
  • 出版年度:2019
  • 卷号:91
  • 页码:1-7
  • DOI:10.1051/e3sconf/20199102036
  • 出版社:EDP Sciences
  • 摘要:The comparative analysis of two options for investment and construction projects, with partial robotization of production and traditional work organization was conducted on the criterion of time and cost minimizing the of construction. The use of two robot types was considered, a bricklayer and a plasterer robot. As a comparison result of main quantitative indicators of construction organization plan, it was found that the use of robots reduced the duration of construction, expenditures and labor costs. Lack of fatiguability, lunch breaks, smoke breaks, conversations, illnesses, as well as round-the-clock operation, the absence of malicious intents, no theft and, therefore, procedural violations, composition disorders, etc., allows to look at the introduction prospect of construction robots with optimism.
  • 其他摘要:The comparative analysis of two options for investment and construction projects, with partial robotization of production and traditional work organization was conducted on the criterion of time and cost minimizing the of construction. The use of two robot types was considered, a bricklayer and a plasterer robot. As a comparison result of main quantitative indicators of construction organization plan, it was found that the use of robots reduced the duration of construction, expenditures and labor costs. Lack of fatiguability, lunch breaks, smoke breaks, conversations, illnesses, as well as round-the-clock operation, the absence of malicious intents, no theft and, therefore, procedural violations, composition disorders, etc., allows to look at the introduction prospect of construction robots with optimism.
国家哲学社会科学文献中心版权所有