期刊名称:IOP Conference Series: Earth and Environmental Science
印刷版ISSN:1755-1307
电子版ISSN:1755-1315
出版年度:2019
卷号:267
期号:4
页码:1-7
DOI:10.1088/1755-1315/267/4/042099
出版社:IOP Publishing
摘要:This paper is based on the tunnels construction in small net distance in Jinan Rail Transit Line R3. The deformation of early mining tunnel when double-line shield tunneling under different net distance conditions is simulated. The results show that the late shield tunneling will cause the clearance convergence, vault settlement and inverted arch uplift of the early mining tunnel to further deformation. When the distance is 0.8 times of the tunnel diameter, reinforcement measures are needed.