首页    期刊浏览 2025年03月03日 星期一
登录注册

文章基本信息

  • 标题:Risk Analysis of Tender Documents on the Execution of Private Construction Work at Badung Regency, Bali Province, Indonesia
  • 本地全文:下载
  • 作者:Ni Kadek Sri Ebtha Yuni ; I Nyoman Norken ; Dewa Ketut Sudarsana
  • 期刊名称:Journal of Sustainable Development
  • 印刷版ISSN:1913-9063
  • 电子版ISSN:1913-9071
  • 出版年度:2017
  • 卷号:10
  • 期号:4
  • 页码:130
  • DOI:10.5539/jsd.v10n4p130
  • 出版社:Canadian Center of Science and Education
  • 摘要:Documents received during the tender, are in the form of drawings, specifications, bill of quantity (BQ), and the general terms of the contract. Tender activity will bring a variety of risks during the project implementation, and this research is done to identify and assessment of risks, mitigating risk and determining the ownership of the dominant risk.The research was conducted on a private building construction project at Badung Regency in Bali, by using a qualitative method and data collection was done through interview, brainstorming with experts and questionnaires. Among the 39 risk identified, 15 risks were obtained from the previous research, and the remaining 24 risks in this research.The results of this risk assessment were that 18 risks (46.2%) categorized into unacceptable, that include: the addition items of work, the drawing does not match with plan, and the changes in the material specifications. Risk assessment fell into the undesirable category that 21 risks (53.8%), including the mismatch information from planners, the arithmetic error, and materials used were not available on the market. Mitigation was done to dominant risk, among others by reassessing, submitting the contract change order, and asking questions. The biggest risk of ownership was the contractor, namely 39 risks with 18 unacceptable and 21 undesirable risks, this mean, problems associated with tender documents should receive the attention to contractors, planner consultants, owners and Quantity Surveyor (QS) consultants. Contractors as the recipient of the biggest risk were expected to increase the competence of those involved in the tender process.
  • 其他摘要:Documents received during the tender, are in the form of drawings, specifications, bill of quantity (BQ), and the general terms of the contract. Tender activity will bring a variety of risks during the project implementation, and this research is done to identify and assessment of risks, mitigating risk and determining the ownership of the dominant risk.The research was conducted on a private building construction project at Badung Regency in Bali, by using a qualitative method and data collection was done through interview, brainstorming with experts and questionnaires. Among the 39 risk identified, 15 risks were obtained from the previous research, and the remaining 24 risks in this research.The results of this risk assessment were that 18 risks (46.2%) categorized into unacceptable, that include: the addition items of work, the drawing does not match with plan, and the changes in the material specifications. Risk assessment fell into the undesirable category that 21 risks (53.8%), including the mismatch information from planners, the arithmetic error, and materials used were not available on the market. Mitigation was done to dominant risk, among others by reassessing, submitting the contract change order, and asking questions. The biggest risk of ownership was the contractor, namely 39 risks with 18 unacceptable and 21 undesirable risks, this mean, problems associated with tender documents should receive the attention to contractors, planner consultants, owners and Quantity Surveyor (QS) consultants. Contractors as the recipient of the biggest risk were expected to increase the competence of those involved in the tender process.
国家哲学社会科学文献中心版权所有