首页    期刊浏览 2024年12月04日 星期三
登录注册

文章基本信息

  • 标题:Metodologia TECLIM para uso racional de água na indústria: o banco de ideias no contexto da metodologia front-end loading
  • 其他标题:TECLIM method for rational water use in industry: the bank of ideas in the context of the front-end loading methodology
  • 本地全文:下载
  • 作者:Oliveira, Geiza Lima de ; Kiperstok, Asher ; Kalid, Ricardo de Araújo
  • 期刊名称:Engenharia Sanitaria e Ambiental
  • 印刷版ISSN:1413-4152
  • 电子版ISSN:1809-4457
  • 出版年度:2016
  • 卷号:21
  • 期号:4
  • 页码:753-764
  • DOI:10.1590/s1413-41522016109240
  • 出版社:ABES
  • 摘要:RESUMO O banco de ideias (BI) é uma ferramenta da metodologia TECLIM para otimização ambiental de processos industriais. Está conceitualmente associado com a metodologia front-end loading (FEL), a qual considera que forte atenção nas etapas iniciais de identificação e seleção de alternativas aumenta as chances de sucesso de um projeto, evitando que recursos sejam desperdiçados ou mal alocados. O BI abrange a etapa FEL 1, na qual é feito o levantamento de ideias, e segue até parte da etapa FEL 2, na qual as oportunidades selecionadas são desenvolvidas a projetos conceituais. O método para priorização de oportunidades no BI é apresentado demonstrando-se a sinergia com a FEL. A aplicação do BI permitiu o cadastro e processamento de 500 ideias com potencial de redução do consumo de água em 1,4 x 103 t.h-1 e de efluentes em pelo menos 0,5 x 103 t.h-1. O BI direciona recursos para projetos conceituais mais atrativos e sustentáveis.
  • 其他摘要:ABSTRACT The bank of ideas (BI) is a TECLIM tool for environmental optimization of industrial processes. It is conceptually associated with the front-end loading (FEL) methodology, which pays particular attention to the initial stage of identification and selection of alternatives of water use, increasing the chances of a project´s success, avoiding wasted or badly allocated resources. The BI covers FEL 1 stage, in which the ideas are invited, followed by stage FEL 2, in which the opportunities selected are developed into conceptual projects. The method of giving priorities to the opportunities in the BI is presented, showing the synergy with FEL. The application of the BI enabled the register and process of 500 ideas with the potential to reduce water consumption by 1.4 x 103 t.h-1 and effluents by at least 0.5 x 103 t.h-1. The BI tool helps to identify the most attractive and sustainable conceptual projects.
  • 关键词:banco de ideias TECLIM;metodologia FEL;uso de água na indústria;produção mais limpa;uso racional de água
  • 其他关键词:TECLIM ideas bank;front-end loading;use of water in industry;cleaner production;rational use of water
国家哲学社会科学文献中心版权所有