期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
印刷版ISSN:2347-6710
电子版ISSN:2319-8753
出版年度:2016
卷号:5
期号:4
页码:5032
DOI:10.15680/IJIRSET.2016.0504061
出版社:S&S Publications
摘要:Lean principle is a technique used in all industries to improve performance, productivity, reducing theproduction cost, eliminate wastages and reduce non-value added, non-cyclic activities. This paper describes theeffective utilization of man power in engine accessory production line carried out at XYZ organization located in SouthIndia. The various activities of the workers have been categorized into cyclic and non-cyclic activities. After observingthe production line, there are 10 workers whose utilization ranges from 29.42% to 71.28%. A standardized workcombination table is drawn for all 10 workers to identify their utilization. Using ECRS tool, some activities wereeliminated, few processes were combined and machines were rearranged and simplified. Value Stream Map (VSM) isdrawn to find out the current cyclic and non-cyclic activities. Future Value Stream Map is developed to design a leanprocess flow through the elimination of the root causes for the wastes and through process improvements. This paperuses some lean techniques thereby helps the management to improve the utilization of man power in engine accessoryproduction line.
关键词:Lean Principle; ECRS; Standardized Work Combination Table; Value Stream Mapping; Engine;Accessory