期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
印刷版ISSN:2347-6710
电子版ISSN:2319-8753
出版年度:2014
卷号:3
期号:4
页码:11488
出版社:S&S Publications
摘要:Inventory management system involves procurement, storage, identification, retrieval, transport andconstruction methods. Each is indelibly linked to safety, productivity and schedule performance. The main objective ofthe study is to analyse the inventory management control adopted and the effective utilization of inventory at theconstruction site. The first part based on conducting questionnaire survey in various construction companies. In secondpart, analysing those results by using Statistical Package for Social Sciences SPSS. ABC analysis is one of theconventionally used approaches to classify the inventories and the case study of a company is collected. The model candeal with both uncertain demand and availability of supply. These findings may mainly reflect the main factors thatwill affect the inventory management system which able to achieve the improved efficiency of project management andto reduce the waste of materials in the respective region of construction industries.
关键词:Inventory; SPSS; Uncertain Demand; Availability of Supply