首页    期刊浏览 2024年12月05日 星期四
登录注册

文章基本信息

  • 标题:Ensemble lagged forecasts of a monsoon depression over India using a mesoscale model
  • 其他标题:Ensemble lagged forecasts of a monsoon depression over India using a mesoscale model
  • 本地全文:下载
  • 作者:CHANDRASEKAR, A. ; KUMAR, VINOD
  • 期刊名称:ATMOSFERA
  • 印刷版ISSN:2395-8812
  • 出版年度:2007
  • 卷号:20
  • 期号:1
  • 语种:
  • 出版社:Centro de Ciencias de la Atmósfera
  • 摘要:DURANTE EL 27 DE JULIO DE 1999 SE FORMÓ UNA DEPRESIÓN MONZÓNICA SOBRE LA BAHÍA DE BENGALA, INDIA, QUE CRUZÓ LA COSTA ESTE DEL PAÍS EL 28 DE JULIO DEL MISMO AÑO. EL SISTEMA OCASIONÓ LLUVIAS ABUNDANTES SOBRE LA COSTA ESTE Y REGIONES ADYACENTES Y ES INVESTIGADO EN ESTE TRABAJO UTILIZANDO MÉTODOS DE ENSAMBLE RETRASADOS CON EL MODELO DE MESOESCALA DE QUINTA GENERACIÓN (MM5) DE LA PENNSYLVANIA STATE UNIVERSITY Y EL NATIONAL CENTER FOR ATMOSPHERIC RESEARCH (PSU/NCAR). SE DISEÑAN DOS GRUPOS DE EXPERIMENTOS CON CINCO MIEMBROS DE ENSAMBLES CADA UNO EMPEZANDO EL 25 DE JULIO DE 1999 A LAS 12 UTC CON INTERVALOS SUBSIGUIENTES DE 3 HORAS. EN EL PRIMER EXPERIMENTO SE UTILIZAN LOS DATOS DEL REANÁLISIS DEL NACIONAL CENTER FOR ENVIRONMENTAL PREDICTION (NCEP) PARA EL PRONÓSTICO DE UN DOMINIO DE MALLA GRUESA Y UN ANIDAJE SUBSECUENTE A UN DOMINIO DE MALLA MÁS FINO (30 KM). EN EL SEGUNDO EXPERIMENTO LOS DATOS DEL REANÁLISIS DEL NCEP SE UTILIZAN DIRECTAMENTE EN EL DOMINIO DE 30 KM COMO CONDICIONES INICIALES Y DE FRONTERA. SE ENCUENTRA QUE EN LOS TIEMPOS INICIALES DE VERIFICACIÓN, EL PROMEDIO DEL ENSAMBLE DEL CAMPO DE PRESIÓN AL NIVEL DEL MAR CORRESPONDIENTE AL SEGUNDO EXPERIMENTO TIENE UNA ESTRUCTURA HORIZONTAL MÁS GRANDE Y ES MÁS CERCANO AL REANÁLISIS DEL NCEP. SIN EMBARGO, SE ENCONTRÓ QUE EN TIEMPOS POSTERIORES DE VERIFICACIÓN EL PROMEDIO DEL ENSAMBLE DEL CAMPO DE PRESIÓN AL NIVEL DEL MAR ES MEJOR EN EL PRIMER EXPERIMENTO. TODOS LOS MIEMBROS DEL ENSAMBLE DEL PRIMER EXPERIMENTO TIENEN VALORES MAYORES EN EL ÁREA PROMEDIO DE PRECIPITACIÓN ACUMULADA DE 24 HORAS QUE LOS DEL SEGUNDO EXPERIMENTO. ASIMISMO, LOS VALORES DE LA DISPERSIÓN DE TODOS LOS MIEMBROS DEL ENSAMBLE DEL PRIMER EXPERIMENTO PARA EL ÁREA PROMEDIO DE PRECIPITACIÓN ACUMULADA DE 24 HORAS SON MAYORES QUE LOS DEL PROMEDIO DE SU RESPECTIVO ENSAMBLE EN EL SEGUNDO EXPERIMENTO. LOS RESULTADOS DE ESTE ESTUDIO PUEDEN SER ÚTILES PARA LOS CENTROS DE PRONÓSTICO OPERATIVO DEL TIEMPO EN LA INDIA, YA QUE PUEDEN PROPORCIONAR DIFERENTES MANERAS DE DESARROLLAR Y PROBAR LA IMPORTANCIA DE LOS ENSAMBLES.
  • 其他摘要:A monsoon depression formed over the Bay of Bengal, India, during 27 July 1999 and crossed the east coast of India on 28 July 1999. The system caused copious rainfall over the east coast of India and adjacent regions and is investigated in this study using ensemble lagged methods with the Pennsylvania State University/National Center for Atmospheric Research (PSU/NCAR) Fifth Generation Mesoscale Model (MM5). Two sets of experiments are designed with five members of ensembles in each set starting at 12 UTC 25 July 1999 and at preceding times separated by 3 hour intervals. In the first experiment, the National Center for Environmental Prediction (NCEP) reanalysis data is utilized in the forecast of a coarse grid spacing domain and subsequent nest down to a finer (30 km) grid spacing domain. In the second experiment, the NCEP reanalysis data is directly utilized in the 30 km domain as initial/boundary conditions. The results of the ensemble average of both experiments are compared with the analysis and observations. It is found that at the initial times of verification, the ensemble average of the sea level pressure field corresponding to the second experiment has a larger horizontal structure and is more closer to NCEP reanalysis. However at later times of verification, the ensemble average of sea level pressure field corresponding to the first experiment is found to be better. The area averaged 24 hour accumulated precipitation of all the ensemble members have higher values corresponding to the first experiment as compared to the second experiment. Also, the spread of the area averaged 24 hour accumulated precipitation of all the ensemble members with respect to their respective ensemble average are higher for the first experiment as compared to the second experiment. The results of the study would be useful to operational weather forecasting centers in India as it would provide them different evaluating ways to develop and test the importance of ensembles.
  • 关键词:ENSEMBLE; MM5; DEPRESSION
  • 其他关键词:Ensemble; MM5; depression
国家哲学社会科学文献中心版权所有