首页    期刊浏览 2024年11月30日 星期六
登录注册

文章基本信息

  • 标题:Engineering geological investigations for evaluation of excavation method and stand-up time of the DK99-DK100 Jakarta – Bandung high-speed railway tunnel, Indonesia
  • 本地全文:下载
  • 作者:Linda Ali ; I Gde Budi Indrawan ; Hendarto Hendarto
  • 期刊名称:E3S Web of Conferences
  • 印刷版ISSN:2267-1242
  • 电子版ISSN:2267-1242
  • 出版年度:2021
  • 卷号:325
  • 页码:1-11
  • DOI:10.1051/e3sconf/202132501005
  • 语种:English
  • 出版社:EDP Sciences
  • 摘要:This paper presents the investigation of surface geology and subsurface engineering geology to analyze the excavation method and stand-up time of the DK99-DK100 Jakarta-Bandung high-speed railway Tunnel, Indonesia. Rock mass quality, tunnel excavation method, and stand-up time determined using Geological Strength Index (GSI), Basic Quality (BQ) systems, converted to Rock Mass Rating (RMR) and The Japan Society of Civil Engineering (JSCE) for comparison. The result shows that the study area consists of slightly to completely weathered andesite breccia and slightly weathered andesite lava. The rock masses at the tunnel elevation had very poor to poor quality and were associated with high weathering degrees. The recommended rock excavation method based on the GSI is digging. The recommended tunnel excavation method based on RMR is multiple drifts, top heading, and bench, while based on JSCE is bench cut method. The tunnel stand-up time is 30 minutes - 2 hours based on the RMR, while it is predicted to be unstable without support based on the BQ. The recommended design is expected to be applied effectively according to the geological conditions. It is expected to understand better the tunnel excavation method in poor rock masses, especially in Indonesia.
国家哲学社会科学文献中心版权所有