期刊名称:International Journal of Advances in Engineering and Management
电子版ISSN:2395-5252
出版年度:2021
卷号:3
期号:10
页码:1418-1433
DOI:10.35629/5252-031011781186
语种:English
出版社:IJAEM JOURNAL
摘要:Population growth in the town usually exerts enormous pressure on existing water supply systems. The continuous and repeated deficiency in the performance of the water network becomes one of the most critical issues in the water supply sector that requires immediate action. Asella town water supply system has problems related to water supply coverage, water quantity, velocity, and system pressure. The main objective of this study is to evaluate the hydraulic performance of Asella town’s existing water supply distribution system with respect to pressure and velocity using Bentley Water GEMS v8i software. The average daily per capita water consumption and water supply coverage of the town in 2020 G.C is 35.31 l/p/d and 42.249% respectively.The simulated result for extended period simulation at peak hour consumption showed that the performance of distribution system related to pressure 47.08% for pressure value (<15m), 32.92% for pressure value (15-60m) and 20% for pressure value (>60m) head and the pressure at minimum consumption hour is 10% for pressure value (<15m), 45.85% for pressure value (15-60m) and 44.15% for pressure value (>60m. The velocity of pipe flow at peak hour consumption showed that 79.56% ofthe velocity (2m/s). From the total 650 nodes in the model, 306 nodes receive water with less than 15m pressure head of water and it indicates the critical point showing that needs a modification. The amount of water which actually reached the consumers on average from 2016 G.C to 2020 G.C is 64.76% of the total annual water production. It is recommended that, the water utility hasadded new water source to deliver adequate water and add parallel pipes or increasing its diameter to deliver water with the required pressure.
关键词:Asella Town;Hydraulic Model;Water Distribution Network;Water GEMS