出版社:Lembaga Penelitian dan Pengabdian kepada Masyarakat
摘要:Increas demand load and power capacity requirement at PT Pindo Deli then the short circuit current that occur will be greater. this can cause damage to electrical equipment located around the point of interrupting and resulting failure of the electrical system in power distribution. from the analysis of the three phase short circuit current 1/2 cycle seen that the bus 1 exceeds the peak breacing asimetry equipment. Where breacing peak bus asymetri 1 was 43.88 kA. While the peak of 3-phase short circuit on the bus 1 is 47.98 kA. To protect the equipment and the entire electrical system in PT Pindo Deli would require the use of Superconducting Fault Current Limiter (SFCL) that will be placed on buses that exceed or approach the critical point. There are two kinds of Superconducting Fault Current Limiter that type of resistive and saturated iron core. In this final project SFCL used is a hybrid resistive Superconducting Fault Current Limiting. By using a hybrid resistive SFCL then flow disturbance will quickly be reduced by utilizing the reactance of Current Limiting Reactor (CLR) that is connected parallel with superonductor So as to secure all the equipment and electrical systems of a total blackout. After determination of Superconducting Fault Current Limiter setting the overcurrent relay coordination to determine whether existing coordination setting in accordance with the conditions there. The coordination displayed using the curve Current Time Curve (TCC).
关键词:3-phase short-circuit currents;Superconducting Fault Current Limiter;Overcurrent relay