期刊名称:Eastern-European Journal of Enterprise Technologies
印刷版ISSN:1729-3774
电子版ISSN:1729-4061
出版年度:2013
卷号:3
期号:4
页码:23-30
DOI:10.15587/1729-4061.2013.14759
语种:English
出版社:PC Technology Center
摘要:The aim of this paper is to develop a fuzzy scheduling problem for solving a multi-objective functions on single machine scheduling problems when processing time and due date are a triangular fuzzy numbers. We are used fuzzy distance function concepts which introduced by Lam and Cai. The objective is to minimize the maximum fuzzy lateness and maximum fuzzy completion time. In this paper we compare and test different local search methods (Threshold accepted (TA), Tabu search (TS), and Memetic algorithm (MA)) computational experience 1000 jobs with reasonable time. For comprise results we use probability and cost considerations in project scheduling