标题:Environmental safety assessment in the influence zone of the existing Zelenchukskaya HPP-PSHS and Krasnogorsk HPP-1, HPP-2 under construction in the area of Ust-Dzhegutinsky reservoir location
摘要:«Environmental safety “in the considered spatial limits of the Upper Kuban basin geosystem (F w=11,0*103km3, W l=3,3*103km3, Watm=110*103Wb.g.U.K..=124,3*103km3) makes up about 21.4% of the spatial limits of the Kuban River, where water resources are formed according to the average long-term data about 3,0 km3, which are used in various sectors of economic activity, including for the electricity generation at Zelenchukskaya HPP-PSHS and Krasnogorsk HPP-1 and HPP-2 under construction with installed power up to 25 mW, located below the HPP-PSHS Zelenchukskaya section and above the alignment (12 km) of the Ust-Dzhegutinsky reservoir. Such HPP-PSHS placement on a 15 km long section of the Kuban Zelenchukskaya riverbed and Krasnogorsk HPP-1 and HPP-2 under construction determined a highly active zone of influence (IV), which is caused by a change in the natural hydrograph of the Kuban River, with the formation of the channel flow movement unsteady hydraulic regime in the considered section of the river to the Ust-Dzhegutinsky reservoir. Unsteady changes in the water level in the Ust-Dzhegutinsky reservoir affects the pressure front structures safety, the functional operation of the water intake system in the Bolshoi Stavropol Canal (BSC) and hydraulic BSC operation. To assess the level of “environmental safety”, it became necessary to develop a mathematical model of the impact of the HPP-PSHS functional work and Krasnogorsk HPP-1 and HPP-2 under construction at the level modes of operation of the Ust-Dzhegutinsky reservoir.