摘要:The paper presents the results of field research in the area of the damless water intake of the KMC on the Amudarya River. The article developed the optimal route and boundaries of the pioneer digging location, depending on the area of the main stream of the river relative to the point of the damless intake. It also provides hydraulic calculations for improving the condition of a damless water intake and recommendations for the rational use and placement of a dredgers fleet when laying a route of a ditch and cleaning it.
关键词:damless water intake;Amudarya;Karshi Main Canal-KMC;hydraulic calculation