摘要:At present, most comprehensive energy planning methods aim at economy. A distributed integrated energy system planning method considering reliability and integrated demand response is proposed. This method considers that IDR can effectively realize the peak valley cutting of load characteristics, improve the system economy, and increase the reliability constraint penalty cost to make it more realistic. The example results show that the proposed method can consider the economy and reliability of configuration results under different conditions, and realize the selection of equipment.