首页    期刊浏览 2024年12月02日 星期一
登录注册

文章基本信息

  • 标题:Bi-Level Load Peak Shifting and Valley Filling Dispatch Model of Distribution Systems With Virtual Power Plants
  • 本地全文:下载
  • 作者:Fengzhang Luo ; Xin Yang ; Wei Wei
  • 期刊名称:Frontiers in Energy Research
  • 电子版ISSN:2296-598X
  • 出版年度:2020
  • 卷号:8
  • DOI:10.3389/fenrg.2020.596817
  • 语种:English
  • 出版社:Frontiers Media S.A.
  • 摘要:Distributed energy resources (DERs) have been widely involved in the optimal dispatch of distribution systems which benefit from the characteristics of reliability, economy, flexibility, and environmental protection. And distribution systems are gradually transforming from passive networks to active distribution networks. However, it is difficult to manage DERs effectively because of their wide distribution, intermittency, and randomness. Virtual power plants (VPPs) can not only coordinate the contradiction between distribution systems and DERs but also consider the profits of DERs, which can realize the optimal dispatch of distribution systems effectively. In this paper, a bi-level dispatch model based on VPPs is proposed for load peak shaving and valley filling in distribution systems. The VPPs consist of distributed generations, energy storage devices, and demand response resources. The objective of the upper-level model is smoothing load curve, and the objective of the lower-level model is maximizing the profits of VPPs. Meanwhile, we consider the quadratic cost function to quantify the deviation between the actual output and the planned output of DGs. The effectiveness of the bi-level dispatch model in load shifting and valley filling is proved by various scenarios. In addition, the flexibility of the model in participating in distribution system dispatch is also verified.
国家哲学社会科学文献中心版权所有