摘要:This paper is intended to explore how many measurements of machine up- and downtimes are necessary to calculate reliable estimates of MTBF and MTTR, and what would be the resulting effect on the machine efficiency evaluation. This issue is addressed by introducing the notion of(α, β)-precise estimate, whereαcharacterizes the accuracy of the estimate andβits likelihood (probability). Based on this notion, the smallest number of measurements,n⁎(α,β), which leads to the desired estimate, is evaluated and utilized for investigation of the induced machine efficiency estimate.
关键词:KeywordsMTBFMTTR estimatesfactory floor measurementsinduced machine efficiency estimatecritical number of measurements for desired estimates accuracy