摘要:Urban construction and environment protection are important contents in the urban regeneration. Theoutput of the construction waste is very huge, which has serious impacts on the ecological environmentand the urban land use during the urban regeneration process. This paper establishes a mathematicstrategy model of the location, capacity and allocation of the construction waste resource center,without considering the landfill for the disposal of the construction waste, which was the basicrecycling disposal method of the construction waste. Then, in aspect of solving the mathematicalmodel, it is proposed to adapt basic simulated annealing algorithm with two stages improvement tosolve the model, which is also controlled in urban construction experience data. Results of the casesimulation show that the mathematical model and the solving method are suitable to the limited number ofthe construction waste resource center model, which can be the references to the problem of urbanconstruction and environment protection in the urban regeneration.