摘要:AbstractIn this paper a new non-dominated sorting genetic algorithm with elite strategy (NSGA2) based production scheduling method is proposed for complex steelmaking and continuous casting production process which is consisted of multiple refining ways. At first, the multi-objective optimization scheduling model is established according to production process and schedule requirement. And then NSGA2 is used to solve the scheduling model. There are multiple Pareto non-inferior solutions from the solving phase, and decision maker may select one of solutions based on own preference, while it is not the most optimal. To fix this problem, the optimal decision making method is put forward, combining the fuzzy membership degree and the variance weighting. Simulation experiments are carried out with the actual industry production data, which shows that the proposed method is practical for industry production.