摘要:AbstractContract Manufacturers (CM) usually schedule production considering each customer´s needs and constraints. One drawback of this strategy is the difficulty of evaluating its general production scheduling, mainly when urgent production rescheduling is needed. The lack of integration and synchronization between CMs and customers imposes that production rescheduling be based on planners experiences. This paper proposes a new conceptual model for contract manufacturing production rescheduling based on the evaluation of delivery risks to customers, including integration between the production scheduling with the customer delivery commitment. The model was implemented and tested by means of a simulation-based procedure using real capacity information.
关键词:KeywordsProduction ReschedulingContract Manufacturer (CM)Contract Manufacturing Service (CMS)SimulationConceptual Model