首页    期刊浏览 2024年12月03日 星期二
登录注册

文章基本信息

  • 标题:Systemic integrated method for assessing factors affecting construction timelines
  • 本地全文:下载
  • 作者:Azary Lapidus ; Ivan Abramov
  • 期刊名称:MATEC Web of Conferences
  • 电子版ISSN:2261-236X
  • 出版年度:2018
  • 卷号:193
  • DOI:10.1051/matecconf/201819305033
  • 语种:English
  • 出版社:EDP Sciences
  • 摘要:To streamline construction planning, one needs to assess and perform trial modeling of organizational and process-related factors impacting the final planned performance indicators. A proper calendar plan, one that would take due account of said factors, has a substantial impact on the efficiency and, sometimes, even the feasibility of a construction project as a whole. Therefore, the purpose of this paper’s research is to develop a method for determining optimum technical and economic parameters. A method should be considered legitimate which, given the labour intensity of the jobs assigned to a crew and the list of such jobs, makes it possible to determine the time said jobs will take to perform depending on the variation of the following factors: crew/unit numbers, job synchronization degree, job performance sequence, number of shifts and unit productivity. The authors have studied the algorithm and the method for the trial modeling of organizational and process-related factors when developing a calendar plan in order to identify qualitative time-specific and feasibility parameters. The paper reviews the example of how the optimum performance timelines for each crew can be determined.
国家哲学社会科学文献中心版权所有