摘要:Gas turbine power of turboshaft engine cannot be measured, a total of five typical steady state point test data from the ground slow state to the maximum state were selected according to the factory acceptance test drive of a certain type of carrier-based helicopter turboshaft engine. Combustion chamber three-dimensional simulation model was established to carry on simulation analysis of different typical steady state combustion process. The simulated combustion chamber exit section parameters are input into the established gas turbine isentropic adiabatic aerodynamic calculation model to obtain the gas turbine power and outlet temperature. Select five typical steady state points of five sets of turboshaft engines on the same type to repeat the above calculation process, and compare the calculated value of gas turbine outlet temperature with the acceptance test values, it is found that the error values are all within 5%, and the effectiveness and accuracy of the gas turbine power calculation method are verified.