摘要:Cross-river tunnel as one of the underground constructions is complicated during its construction. For stability of tunnel excavation, it is emergency to analyze the dynamic characteristics of tunnel deformation under high water pressure. Therefore, a cross-river tunnel model is proposed based on DEM in this paper. Stiffness of particles decreases during excavation process which is as one of excavation methods. Porosity ratio of original porosity over its value at different excavation time has been considered. Radial displacements of particles at different angle around the tunnel are detected during excavation process. It shows that large deformation occurs at the vault of the excavation zone which accompanies with large radial displacement. The upper half of the tunnel performs larger deformation than the lower half part which results in many cracks in the concrete lining, the high water pressure may play an crucial role in it.